D.A. Building Systems is a locally-owned company based in Lethbridge since 1980, known for in-house design, fabrication, and erection of high-quality steel structures. To support growth, they chose Silver Ridge Construction to build a purpose-built 46,000 SF facility in Sherring Industrial Park, combining two-storey office space and high-performance manufacturing areas.
Working within DA’s exacting standards, we coordinated the design to accommodate key production needs: overhead crane systems, a paint booth, welding bays, and laser cutting lines. The building features insulated metal panels and a Durolast roofing system.
The primary challenge was integrating tightly spaced, high-value equipment into a new facility while future-proofing the layout for expansion. We led planning sessions with the owner, engineers, and consultants to confirm locations for specialized utilities and structural provisions, ensuring the facility could expand efficiently in future phases.
Silver Ridge oversaw the full construction lifecycle: site coordination, trade management, and logistics—enabling D.A. Building Systems to focus on transitioning into their new space without disruption. The project was completed on time and on budget.
By partnering with Silver Ridge Construction, D.A. Building Systems achieved a turnkey facility tailored to manufacturing precision and engineered for long-term growth. The result is a high-performance industrial site that supports operational efficiency today and scalability tomorrow.
Project Details
Location
3853 26 AVE N, Lethbridge
Project Type:
Industrial building
Size
4600 SF




















